流程图是雅思写作最难的题型之一。今天给大家带来的流程图范文是关于房屋保护话题的,请看雅思考官Simon的精彩演绎。接下来请看雅思内容:雅思小作文流程图9分范文:房屋保护
雅思小作文流程图9分范文:房屋保护
请看本文前考官同学的精彩演绎。最难题型之一流程图:房屋保护,共184词,band 9。考官的四段套路:introduction+review+2 details。
话题:
The diagrams below show how houses can be protected in areas which are prone to flooding.
范文
The diagrams compare two different methods of defence for homes which are at risk of being flooded.
The key difference between the diagrams is that they show flood protection with and without a stopbank. In either case, the at-risk home is raised on stilts above ground level.
The first diagram shows how a stopbank acts as a flood barrier to stop river water from flooding homes. The stopbank is a small mound of land next to the river that is higher than the 100-year flood level, and prevents the river from bursting its banks. Nearby houses can be built on stilts to prevent flooding from rainwater, and a floodgate beneath the stopbank can be opened to allow this ‘ponding’ to drain off into the river.
When there is no stopbank, as shown in the second diagram, there will be nothing to stop the river from flooding. In this case, the solution is to put buildings on stilts. The height of the stilts is measured so that the floor of the house is 300mm above the 100-year flood level. This measurement is called the ‘freeboard’.(184)
以上为网带来的雅思内容:雅思小作文流程图9分范文:房屋保护。希望大家能够理解和领悟这些内容,打造自己的高分写作模板。更多雅思写作精彩内容,请关注网论坛!